How to Prepare Your Calgary Sprinkler System for Winter — Step by Step 2026

Preparing your Calgary sprinkler system for winter involves three distinct steps — shutting down watering cycles, professional compressed-air blowout, and post-blowout isolation. This step-by-step guide walks you through the full winterization process and explains what J.G. Irrigation handles vs what the homeowner does.

Calgary sprinkler winterization — Complete Step-by-Step Process

Step Who Does It When
1. Stop all irrigation cycles Homeowner — switch controller to Rain Off or Off When daytime temps drop below 10°C consistently (mid-September)
2. Book professional blowout Homeowner — call J.G. Irrigation: 587-433-4795 Early September (before September 20 for guaranteed booking)
3. Pre-blowout: locate access point Homeowner — clear path to irrigation main shutoff and blowout port Day before blowout appointment
4. Compressed-air blowout J.G. Irrigation technician — zone-by-zone, 2-3 passes each 20-60 minutes on site
5. Close irrigation main shutoff Homeowner (or technician if accessible) — inside home near water meter Immediately after blowout completes
6. Leave controller off for winter Homeowner — controller stays off until spring startup Until May 2027

J.G. Irrigation handles steps 4 and 5 (blowout + confirming shutoff). The rest are simple homeowner steps. The most common winterization mistake: not closing the main shutoff after the blowout — residual line pressure can allow trickles to re-enter the system. Always close the irrigation main after blowout. Call 587-433-4795 to book your Calgary blowout.

Calgary Sprinkler Winterization — Book Your 2026 Blowout Now

Call 587-433-4795Book Online